Home
About HPA
Contact
Success Stories
Water Treatment
Wastewater Treatment
Civil/Environmental
Marine
Building - New/Renovation
Design-Build
Green/LEED
Current Projects
Water Treatment
Wastewater Treatment
Civil/Environmental
Marine
Building - New/Renovation
Design-Build
Green/LEED
Clients
Design/Build
Awards/Media
Career
E-Bidding Login
Client Projects
Picayune Strand Restoration Project, Merritt Pumping Station
Client : ACOE
Category : Building - New/Renovation
Desc : Project consists of a pump station, tie-back levees, spreader berms and canal plugs which will slow water flowing through existing canals an
.... Read More
S-331 Command and Control Center
Client : ACOE
Category : Building - New/Renovation
Desc : This Design-Build Procurement included constructing a command and control building room to the SFWMD’s existing pump station S331 to provide
.... Read More
Pump Station 361 Central and Southern FL
Client : ACOE
Category : Building - New/Renovation
Desc : The work included construction of the pumping station concrete substructure and concrete superstructure, earth work associated with the pump
.... Read More
Picayune Strand Restoration Project, Merritt Pumping Station
Client : ACOE
Category : Civil/Environmental
Desc : Project consists of a pump station, tie-back levees, spreader berms and canal plugs which will slow water flowing through existing canals an
.... Read More
S-331 Command and Control Center
Client : ACOE
Category : Civil/Environmental
Desc : This Design-Build Procurement included constructing a command and control building room to the SFWMD’s existing pump station S331 to provide
.... Read More
Kissimmee River Florida Project, Structure 68A
Client : ACOE
Category : Civil/Environmental
Desc : Project consists of constructing a water control structure on the Southeast side of Lake Istokpoga, adjacent to the existing 3-bay spillway,
.... Read More
Seminole Big Cypress Indian Reservation Western Water Conservation Restoration Project – Basin #1 and Siphon #1
Client : ACOE
Category : Civil/Environmental
Desc : Construct 10 miles of levee and canals, 14 gated control and overflow structures, 1 twin-barrel inverted siphon with inflow and outfall stru
.... Read More
Surface Facility for Lake Okeechobee ASR Pilot Project Kissimmee River Site, Central & Southern Fl project Comprehensive Everglades Restoration Plan
Client : ACOE
Category : Civil/Environmental
Desc : Construct 5 MGD surface water treatment facility for treating and injecting surface water from Kissimmee River into Aquifer Storage and Reco
.... Read More
Shoreline Stabilization Project Section 111 Virginia Key
Client : ACOE
Category : Civil/Environmental
Desc : This project consists of demolishing and building 25 Timber groins ranging in length from 20 to 70 Feet, site improvements, importing of bea
.... Read More
Bankhead Lock & Dam Black Warrior River
Client : ACOE
Category : Civil/Environmental
Desc : This project involved removal of two 250 ton miter gate leaves and transporting them downstream for disposition at a reclamation site. Two
.... Read More
Central & Southern Florida Ecosystem Critical Restoration Project, Western C-11 Basin Phase 2, Spillway 381
Client : ACOE
Category : Civil/Environmental
Desc : Construction of Three Bay Obermeyer Hydro, Inc. gated spillway with needle dams and service bridge intake and discharge basins and control h
.... Read More
Temporary Pump Station 332B/North Detention Area
Client : ACOE
Category : Civil/Environmental
Desc : Design/Construct new detention pond for Pump Station 332D. Modify two pump discharge pipes to place water into the new Detention Pond. This
.... Read More
IOP Emergency Contract Central and Southern Florida Project for Flood Purposes
Client : ACOE
Category : Civil/Environmental
Desc : This project was a Design-Build procurement that was Designed and Constructed in 90 days, and included: Design/Construction of Pump Station
.... Read More
Pump Station 361 Central and Southern FL
Client : ACOE
Category : Civil/Environmental
Desc : The work included construction of the pumping station concrete substructure and concrete superstructure, earth work associated with the pump
.... Read More
Temporary Pump Station 332B
Client : ACOE
Category : Civil/Environmental
Desc : This project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. T
.... Read More
S-331 Command and Control Center
Client : ACOE
Category : Design-Build
Desc : This Design-Build Procurement included constructing a command and control building room to the SFWMD’s existing pump station S331 to provide
.... Read More
IOP Emergency Contract Central and Southern Florida Project for Flood Purposes
Client : ACOE
Category : Design-Build
Desc : This project was a Design-Build procurement that was Designed and Constructed in 90 days, and included: Design/Construction of Pump Station
.... Read More
Temporary Pump Station 332B
Client : ACOE
Category : Design-Build
Desc : This project was a Design-Build procurement that was Designed and Constructed in 90 days. This pump station is built of structural steel. T
.... Read More
Kissimmee River Florida Project, Structure 68A
Client : ACOE
Category : Marine
Desc : Project consists of constructing a water control structure on the Southeast side of Lake Istokpoga, adjacent to the existing 3-bay spillway,
.... Read More
Surface Facility for Lake Okeechobee ASR Pilot Project Kissimmee River Site, Central & Southern Fl project Comprehensive Everglades Restoration Plan
Client : ACOE
Category : Marine
Desc : Construct 5 MGD surface water treatment facility for treating and injecting surface water from Kissimmee River into Aquifer Storage and Reco
.... Read More
Shoreline Stabilization Project Section 111 Virginia Key
Client : ACOE
Category : Marine
Desc : This project consists of demolishing and building 25 Timber groins ranging in length from 20 to 70 Feet, site improvements, importing of bea
.... Read More
Bankhead Lock & Dam Black Warrior River
Client : ACOE
Category : Marine
Desc : This project involved removal of two 250 ton miter gate leaves and transporting them downstream for disposition at a reclamation site. Two
.... Read More
Kissimmee River Florida Project, Structure 68A
Client : ACOE
Category : Water Treatment
Desc : Project consists of constructing a water control structure on the Southeast side of Lake Istokpoga, adjacent to the existing 3-bay spillway,
.... Read More
Surface Facility for Lake Okeechobee ASR Pilot Project Kissimmee River Site, Central & Southern Fl project Comprehensive Everglades Restoration Plan
Client : ACOE
Category : Water Treatment
Desc : Construct 5 MGD surface water treatment facility for treating and injecting surface water from Kissimmee River into Aquifer Storage and Reco
.... Read More
Water Treatment Plant
Client : ACOE
Category : Water Treatment
Desc : This Design/Build project was the first Nanofiltration Water Treatment Plant placed in service in the State of Georgia. The work included d
.... Read More